For sling load long line operations, what is the minimum landing point size and diameter?

Prepare for the Sling Load Inspector Certification Course Test. Study effectively with flashcards and multiple choice questions, each accompanied by hints and explanations. Get ready to ace your exam!

Multiple Choice

For sling load long line operations, what is the minimum landing point size and diameter?

Explanation:
When you use a long line for sling-loads, the load can swing a lot because of line length, gusts, and rotor wash. To keep the load, line, and helicopter safe from obstacles and people on the ground, the landing point around the drop or hookup must be large enough to accommodate that movement. The size rating reflects how much clearance is expected; a higher size means a larger area. For long-line operations, you need the largest recommended clearance, which is a size 6 landing point with a diameter of 125 meters. Anything smaller wouldn’t provide enough swing clearance under typical conditions, increasing the risk of line strikes or contact with obstacles.

When you use a long line for sling-loads, the load can swing a lot because of line length, gusts, and rotor wash. To keep the load, line, and helicopter safe from obstacles and people on the ground, the landing point around the drop or hookup must be large enough to accommodate that movement. The size rating reflects how much clearance is expected; a higher size means a larger area. For long-line operations, you need the largest recommended clearance, which is a size 6 landing point with a diameter of 125 meters. Anything smaller wouldn’t provide enough swing clearance under typical conditions, increasing the risk of line strikes or contact with obstacles.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy